Some Projects perfomed by the company:

New Federal Parking Garage, San Juan, Puerto Rico, FBI. June 2010.

USPFO PR-Urban Assault Course for The Benham Companies, LLC at Camp Santiago, Salinas, Puerto Rico, Puerto Rico National Guard, May 2010-June 2010.

As-built access roads with mean sea level elevations for PUMA ENERGY PUERTO RICO, March 2010.

Stakeout of three (3) tanks & the perimeter wall for PUMA ENERGY PUERTO RICO, Guaynabo Terminal Bulk, November 2009.

Leveling the railroad tracks for bridges crane, USACE, Bechara Industrial Area Project, October 2009.

 
As-built of 12” pipe for PUMA ENERGY PUERTO RICO, from Cataño Oil Dock until area Joint. February 2009 - September 2009

Geometric Diagrams for TOTAL PETROLEUM PUERTO RICO. CORP Facilities Plant. August 2009.

Mini Stadium, Toa Baja, Puerto Rico, Toa Baja County Project, January 2009- July 2009.

Cataño Oil Dock Hydrographic Survey for TOTAL PETROLEUM PUERTO RICO CORP, June 2009 - July 2009.

Topography & As Built for PUMA ENERGY Plant at Pueblo Viejo, Guaynabo, Puerto Rico, January 2008- November 2008.

Geometric Diagrams for PUMA ENERGY Facilities Plant. April 2008-November 2008.

All Kind of Surveys or Stake Out for DRAGADOS-USA at Portugues Dam Project, Ponce, Puerto Rico, USA CORP OF ENGINEERS, June 2008-November 2008.

Villa Marina’s Sea Port Batimetric, EMPRESAS FERRER, Fajardo, Puerto Rico, May 2007.
Topography and As Built for Shell Bitumen at Pueblo Viejo, Guaynabo, Puerto Rico. April 2007.
Management of the Federal Project for General Service Administration (GSA), José V. Toledo BLDG, Old San Juan, June 2006 to November 2007.
Topography, As Built and Stake Out for the entrance of Veve Calzada area intersection with Road # 3 & Conquistador Avenue, Fajardo, Puerto Rico, November 2005.
Topography, As Built and Stake Out for the entrance of Exam Driving area intersection with Conquistador Avenue, Fajardo, Puerto Rico, October 2005.
Topography, As Built and Stake Out for the entrance of Quebrada Vueltas Street intersection with Road # 3, Fajardo, Puerto Rico, September 2005.
Topography, As Built and Stake Out for the entrance of Altamira area intersection with Road # 3, Fajardo, Puerto Rico, August 2005.
Topography, As Built and Stake Out for the entrance of Monte Brisas area, Conquistador Avenue intersection with road # 184, Fajardo, Puerto Rico, July 2005.
Construction of “Paseo Lineal, Desvío South”, Patillas, Puerto Rico, June. 2005.
Topography and Measurement of Parcel placed in road # 186, Barrio Las Cuevas, Trujillo Alto, for a building development. May. 2005.
Survey, Topography of Land Parcel sited in Aguadilla, for urban development. Jan. 2005
Survey, Topography & As-built of INIX Pharmaceutical, sited in Manatí .Oct.2004
Survey, Topography of Land Parcel located in Utuado. May. 2004
Tren Urbano, NECSO, PUERTO RICO, Gathered updates from the original drawings of Sagrado Corazon station for performing “asbuilts”. Feb.2004.
J.C.REMODELING, PUERTO RICO, Muelle4, Hotel Paraíso, Melía, Río Grande, Cibavisión, Cidra. Aug.2003-Jan.2004.
NECSO, PUERTO RICO, Tren Urbano, Worked as Surveyor Chief in the following stations: Las Lomas, San Francisco, Centro Médico and Cupey Station. 2002-2003.


CORSAN-CORVIAM, Barcelona, Spain, Worked as Surveyor and Technical Office Chief in the High Velocity line: (AVE) Madrid-Zaragoza-Barcelona- French Frontier Tract: Lleida-Martorell. Subtract: II-A. PP.KK.200+000 a 210+520.353.
In charge of the verification and replanting of the underground parking at Viladecans.
Performed the analysis including the verification and modification of the variant situaded in P.K.208 at CN-260 of municipal term of Llest between Seu de Urgell and Puigcerda (Lleida).
Collaborated with the remodeling and conditioning of Turopark.
Developed the design of the detour of the road B-203 of AENA (Autoridad Española Nacional de Aeropuertos) (Barcelona Airport).2001-2002.
PAVASAL CONSTRUCTION COMPANY, Valencia, Spain. Worked on the design and execution of Industrial polygon South-9. 2000-2001.
TECSA CONSTRUCCION COMPANY, Valencia, Spain. Worked in the renewal of the train line 1 for F.G.V. in Subtrac2 Alcudia and Alberic.1998-2000. Worked in the renewal of train line of the rail in the line Cartagena – Los Nietos of FEVE


ABB-SADESPA S. A , MADRID, Spain & Kenya, Africa. Worked in a rural electrification project that consists of the electrical placement in a 500 Km road in Kenya, and also collaborated in the elaboration of a project called POWER PROJECT IV – A ELECTRIFICATION OF HABABAH, KHAMER & RIYADAH AREAS (Yemen).1997-1998.
BABCOCK MONTAJES, S.A. Valencia, Spain. Collaborated as a surveyor in industrial topography, leveling beams (“vigas carrileras”) and railroad tracks for bridges crane. Worked on the alignment and verticality of pillars at Puerto de Sagunto, Valencia.1996-1997.
CERVERA CENTRE, Valencia, Spain, Worked as a surveyor at Parque de Ses Estacions en Palma de Malorca for a multinational company, DRAGADOS, and in the “Auto vía” track in Guadasuar (Valencia) for a regional company, PAVASAL.Performed the analysis of road layout in Mores (Zaragoza).1995-1996.
PLODER S.A. CASTELLON, Valencia, Spain, Variante de Nules Road N-340, Cadiz-Barcelona. 1994-1995.
AUTONOMOUS WORK, Valencia, Spain. 1992-1994.